Сменная насадка для обивки 4 130-001 0 Karcher Puzzi 10/1/ 2


Поделиться:

Цена:*
Стоимость в USD (на сегодня):Узнать

Количество:

Описание и отзывы

Характеристики



Product Description


Product Name
High Qaulity Replacement Wet and Dry Upholstery Nozzle 4.130-001.0 For  Puzzi 10/1 Puzzi 10/2 Puzzi 30/4 Puzzi 8/1
Material
ABS 
Function
Cleaning 
Package
PP bags + Carton box 


  • Product performance description

  • 产品性能介绍说明

High Qaulity Replacement Wet and Dry Upholstery Nozzle 4.130-001.0 For Puzzi 10/1 Puzzi 10/2 Puzzi 30/4 Puzzi 8/1




Details Images


For Karcher BR 30/4 C




High Qaulity Replacement Wet and Dry Upholstery Nozzle 4.130-001.0 For  Puzzi 10/1 Puzzi 10/2 Puzzi 30/4 Puzzi 8/1
High Qaulity Replacement Wet and Dry Upholstery Nozzle 4.130-001.0 For  Puzzi 10/1 Puzzi 10/2 Puzzi 30/4 Puzzi 8/1
High Qaulity Replacement Wet and Dry Upholstery Nozzle 4.130-001.0 For  Puzzi 10/1 Puzzi 10/2 Puzzi 30/4 Puzzi 8/1


Product Usage


    • Product usage introduction

产品使用方式介绍
High Qaulity Replacement Wet and Dry Upholstery Nozzle 4.130-001.0 For  Puzzi 10/1 Puzzi 10/2 Puzzi 30/4 Puzzi 8/1


  • Description of product use effect

产品使用效果说明
High Qaulity Replacement Wet and Dry Upholstery Nozzle 4.130-001.0 For  Puzzi 10/1 Puzzi 10/2 Puzzi 30/4 Puzzi 8/1


Related Products




Packing&Shipping


PP waterproof bags first then small carton box then Master Carton box
Customized package is available




Company Introduction


Dongguan Meixin Electronics Co.,Ltd was established in 2016, loacated in Jinxingda industry Park Dalingshan Town ,Dongguan city,China.We are Specialized in Developing Cleaning accessories related products. such as Vacuum cleaners Lithuim battery Charger,Cleaning brush , windows cleaning mop pad, steam cleaning mop pad , dust bags, vacuum filters, hepa filters, windows scraper ,steam floor nozzle, steam handle nozzle, roller brush ect. We have our own mould design and development department ,mould makingdepartment , plastic injection workshop , assemblly line, product test line and product package line . Plus we have matual supplychains based on Manufacturing center DONGGUAN China.Thanks to our welltrained workers, advanced equipment,professional sales team, mature logistic system, we can meet you short lead time requirements. Trial order is welcomed , We hope this could lead to morebusiness between us.We are looking forward to be your reliable supplier and long-term business partners in China.Welcome to visit us.




Our Services & Strength
1. Private Mould Design and development in Veyr Good Price. Normally it needs 25-30 Days for one Mould.
2. Own Plastic Injection workshop, Lower the Manufacturing cost
3. Mature Supply China within Shenzhen , Dongguan and guangzhou city
4. Well trained workers, fast prodcuing , fast delivery based on mature logistic system
5. Specializing in Vacuum Cleaning Related accessories.


FAQ


Q: Do you accept private mould design and development ?
A: Yes

Q: How long it will takes for completing an normal size private mould from strat to end ?
A: Usually it takes 25 days from design to mould finish. but sometims it will be longer as 30 days



Похожие товары

Новинки - Розница

0.2127 s.