Поделиться:
Category | Grade | Diameter | Standard |
High speed steel | 6542,M2,M35,M42 | 1mm-600mm | GB/T3077-1999 |
Mold steel | Cr12,Cr12MoV,Cr12Mo1V1,D2,SKD11,DC53 | 1mm-600mm | GB/T3077-1999 |
Carbon structure steel | Q195, Q215, Q235, Q275 | 1mm-600mm | GB/T700-2006 |
Low alloy high strength structure steel | Q295, Q345, Q390, Q420, Q460 | 1mm-600mm | GB/T1591-2006 |
Prime Carbon structure steel | 10#, 20#, 35#, 45#, 60#, 20Mn, 65Mn, B2, B3, JM20, SH45,S45C, C45 | 1mm-600mm | GB/T699-1999 |
Alloy structure steel | 30Mn2, 40Mn2, 27SiMn, 42Crmo,20Cr, 40Cr, 20CrMo, 35CrMo, 20CrMnTi, 30CrMnTi,20MnVB, 20MnTiB, 20CrNiMo, Q345B, 35MnBM, | 1mm-600mm | GB/T3077-1999 |
Spring Steel | 65Mn, 60Si2Mn, 50CrVA | 1mm-600mm | GB/T1222-2002 |
Bearing Steel | GCr15, GCr15GD,55SiMoV | 1mm-600mm | GB/T18254-2002 |
Structural steels subject to end-quench hardenability requirements | 20CrMnTi, 30CrMnTi, 20Cr, 40Cr, 30CrMo, 42CrMoA, 27SiMn, 40Mn2H, 20CrNiMo, 40Mn2, q345b, 35MnBM, 40MnB,45MnV. | 1mm-600mm | GB/T5216-2002 |
Package:Standard export seaworthy or as customers' requirements
Storage: Pay attention to moisture, dust, oil, lubricating oil, as well as surface rust, or poor welding corrosion resistance.When water is immersed between the film and the steel substrate, the corrosion rate is faster than that without the film.Warehouse storage should be placed in a clean, dry and easy to open the air, to maintain the original packaging state, the stainless steel film should avoid direct light, film should be periodic inspection, if the film deterioration (film life of 6 months) should be replaced immediately, if the packing material when pad paper, in order to prevent surface corrosion should be
immediately removed pad paper.
Q1. Are you trading company or manufacturer ?
A: We are professional manufacturer, providing a wide range of steel products.
Q2. Do you provide samples ?
A: Yes ,we would provide samples For Free . The courier freight will be covered by customer’s account.
Q3.what about the payment terms ?
A: We accept different payment terms like T/T, L/C , Cash, Western Union, Alibaba online paying etc .
Q4.How about the delivery time?
A: Normally it takes 7-15 days since order confirmation.
Q5. Could you customized as our request?
A: Yes, just tell your demands, we can offer the customized solution for you, such as material, hardness, thickness,width and so on.